Although the marina remains closed new guidelines are being trialled to allow local marine contractors to work on site during specific periods. Contractors based in Gwynedd will be given access to the pontoons and boat storage areas to carry out work on berth holder's boats. 

To ensure site safety, access will only be permitted from 9.00am to 4.30pm Monday to Friday. Contractors will be required to contact the Hafan office in advance and complete our contractors details form confirming the contractor will adhere to Government guidelines on social distancing and wearing appropriate PPE. Marina staff will be on hand to unlock the bridge head and storage area gates as required. If the trial runs smoothly the arrangements could be extended to contractors based outside Gwynedd. 

If you would like a local marine business to inspect, or carry out work, on your boat, please get in touch with your preferred contractor and request that the contractor makes the necessary arrangements with us.